Design Package Sequencing Conflicts
Design Package Sequencing Conflicts

Main home Forums Business & Marketing Design Package Sequencing Conflicts

  • This topic has 1 reply, 2 voices, and was last updated 2 weeks ago by Anonymous.
Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #12948
    Anonymous
    Inactive

    We’ve noticed recurring issues with design packages being issued out of logical construction sequence. This causes rework when field teams receive incomplete design intent for certain assemblies. Our project controls team proposed adding a constructability gate at each issue milestone. Has anyone implemented stage-gate reviews that effectively flag sequencing risks before IFC release? We’re exploring options that won’t delay approvals.

    #12966
    Anonymous
    Inactive

    We had a similar problem when design packages were issued out of build sequence, leading to field confusion and partial rework. Introducing a review step based on https://www.fields-builds.com/blog/constructability-review-best-practices helped us align drawings with construction logic. Setting up quick constructability gates at each milestone ensured assemblies were reviewed for sequencing before IFC, improving flow without slowing approvals.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
a
Emeritus Education

Lorem ipsum dolor sit amet con sectetur adipisicing elit sed don eiusmod tempor inci